
Completed Tasks
TASK 7 - CENTRAL SOLAR HEATING PLANTS WITH
SEASONAL STORAGE
DURATION: 1979-1988
OPERATING AGENT: Sweden
» SCOPE
- Establishing the feasability and cost-effectiveness
of CSHPSS
- Design tool development
- Evaluation of design concepts
- Performance measurement and evaluation
Through the use of central solar heating plants with
large, seasonal storage systems, solar energy can be collected during
the summer and stored until needed in the heating season when solar radiation
is often insufficient. As a result of the Task 7 collaboration, significant
advances were made in this technology.
During the first phase, participants collected engineering,
performance and cost data on the major component subsytems. A parallel
effort involved the development of MINSUN,
a simulation and optimization program for central solar heating plants.
In the second phase, MINSUN was used to make a systematic
evaluation of various design concepts and to identify thise which appeared
to be modt promising. During phase III, participants exchanged data on
the design, construction and operation of existing or new CSHPSS
systems and jointly evaluated this information.
> Task
7 Publications List
|