Completed Tasks
TASK 16 - PHOTOVOLTAICS IN
BUILDINGS
DURATION: 1990 - 1995
OPERATING AGENT: Germany
» SCOPE
- PV system design and engineering
- Building integration
- PV demonstration buildings
- Design handbook
Before there can be extensive use of photovoltaics
in the building sector, not only must the cost of PV system be reduced,
but there needs to be a better understanding of how to effectively integrate
photovoltaics into the building, from both an engineering and architectural
standpoint.
Task 16 is dealing with those architectural and engineering
integration issues. The objectives are to maximize the overall solar contribution
to the building, to understand how to effectively integrate PV with the
building structure, to understand the relationship with other elements
of the building's energy system, and to optimize the economics. Both residential
and commercial buildings and both grid-connected and stand-alone buildings
are included.
Through the use of surveys, information is being compiled
on existing PV components and systems, energy-efficient electric appliances,
safety issues, and codes and regulations. Another element of the task
involves the exploration of various methods in integrating modules into
building roofs and facades. This is being accomplished at the IEA Demosite
in Lausanne, Switzerland where different integration approaches are being
tested and demonstrated. In addition, an international workshop on mounting
technologies has been held. The design and construction of demonstration
buildings by participating countries is yet another significant aspect
of this Task.
Task 16 is also sponsoring an international design
competition for PV buildings.